Lots of fill has been been brought into the sanctuary to bring the floor up to the top of the foundation. It will be wet down and compressed and more fill brought in and compressed before the final concrete floor is begun.

The outside main entrance hasn’t changed much.

The newly raised sanctuary floor is in the background.

Higher walls.

The north side of the narthex from above.

From the second floor.

Celador, our faithful watchman.