So much work has been done! Although there’s plenty left to do. You can see things beginning to take real shape.
Future home of Lakeside Presbyterian Church!
No more outside wall on the lake side of the building. But plenty of rubble!
This little bodega was built to hold equipment while we’re building. (And for dogs to be able to nap in the shade.)
In the foreground you see the wall between the main church building and the fellowship hall.
That’s a lot of steel stretching into the sky! You can see the foundations for the church offices on the left, the library in the middle, bathrooms and large classroom on the right.
Foundation walls for the church offices. (In the background, you see a pile of bricks. New walls will start going up soon!)
Front and center, you see the base of a pillar. Directly behind is the foundation for the angled doorway into the sanctuary.
The required mascot photo